Studies of air heating in the painting chamber

For company:Bühler CZ s.r.o.
Place:Žamberk
Type:Other
Year:2022
Product:Other
Realisation nr:409/22

A study of changing the heat source to hot water and indirect heaters with natural gas/light fuel oil dual-fuel burners for air heating in a wet paint booth.

  • Studies - illustration picture.
  • Studies - illustration picture.
    Custom production

    Inquire custom production

    Contact us

    Demand

    References

    Basic project of the use of waste heat from the hall H7 pyrolytic furnace flue gas.
    Stráž nad Nisou, KNORR-BREMSE Systémy pro užitková vozidla ČR
    MoreŠipka
    The technology exhaust and connection to the heat exchanger
    Rumburk, Benteler Automotive Rumburk s.r.o.
    MoreŠipka
    ORC device thermal design
    Plzeň, Doosan Škoda Power s.r.o.
    MoreŠipka